St. Louis, MO – BJC/WUSM Children’s Specialty Care Center

December 22nd, 2021

We were selected as the exterior and interior steel stud framing, drywall, taping and insulation contractor on a new BJC/WUSM Children’s Specialty Care Center in St. Louis, MO. On the interior our talented carpenters furnished and installed a plexiglass track and mounted brackets to the wall for the model train. The plexiglass was pre-fabricated with […]


Edwardsville, IL – Anderson Rehabilitation Hospital Completed

July 8th, 2021

We finished the new hospital in Edwardsville, IL with Korte Company.  Below are just a few pictures of the dining area with some higher end finishes.


St. Louis, MO Hospital Project Progress

May 15th, 2021

We were selected by Holland construction as the steel stud framing, drywall and taping contractor on a new three story specialty care hospital in St. Louis, MO.  With an extremely fast schedule and complicated intricate exterior steel stud framing, we were able to get the building in the dry on schedule.


Metal Trusses Complete Fenton, MO

May 7th, 2021

We were selected as the framing, drywall and acoustical ceilings contractor on a new Ambulance station in Fenton, MO.  The exterior cladding didn’t have any EIFS (Dryvit) or stucco but was all brick and metal panels.  Interior was taped smooth with no plastering.  Thanks to our great carpenters, the metal trusses installed smoothly and always […]


Arnold, MO Hospital Begins – EIFS Weather Barrier

November 19th, 2020

This three story hospital/medical building we’re working on was shut down in March for six months due to Covid concerns but started back up this month.  Our scope of work is the EIFS weather barrier behind the Nichiha Fiber Cement board and brick, cold formed steel stud framing, drywall and finishing/taping. The EIFS plastering weather […]


Alton, IL – SIUE Dental Medicine starts

October 27th, 2020

We had the privilege of being selected by Poettker Construction to be the drywall and plastering contractor to install steel stud framing, drywall, insulation, taping, EIFS (Stucco) and acoustical ceilings on the new SIU School of Dental Medicine building.  Like most projects right now it’s a huge push to get it enclosed before winter and […]


Edwardsville, IL – Anderson Rehabilitation Institute begins

October 23rd, 2020

We had the privilege of being selected by The Korte Company as their stucco contractor and drywall contractor to install the steel stud framing, drywall, insulation, taping, EIFS (Synthetic Stucco) and acoustical ceilings on a new medical building in Edwardsville, IL.  We started our work and despite all the recent rain the job is progressing […]


Marion, IL VA Medical Center – EIFS Plastering Completed

October 2nd, 2020

We recently completed a remodel of an old building in Marion, IL.  The building is many decades old and we reinstalled and repaired EIFS (Dryvit) / Stucco on the exterior of the building as well as built all the walls and ceilings.  With the exposed structure design and all new stucco it looks really neat. […]


Mt. Vernon IL – Health Clinic Completed with Wood Ceiling by 9 Wood

November 21st, 2019

We were selected as the drywall contractor and acoustical ceiling contractor on this project in Mt. Vernon, IL.  It had very intricate curved drywall soffits and a waved wood ceiling (by 9 Wood https://www.9wood.com/) which turned out extremely well and our very proud of our carpenters and tapers.


St. Elizabeth’s Hospital – O’Fallon, IL – Work Continues

December 7th, 2016

We’ve been working closely with the Alberici-Holland Joint Venture team in completing the state of the art 144 bed new replacement hospital in O’Fallon, IL at lightning speed.  EIFS has not started but framing of walls and ceilings along with drywall and taping is well underway on all six floors. All ~105ea prefabricated bathrooms units […]