Commercial


Centralia, IL – KFC EIFS

November 14th, 2024

Our plastering crew completed the EIFS on this brand-new KFC. This location is looking good.


Fairview Heights, IL – Golf Galaxy

October 22nd, 2024

Our plastering crew recently completed the EIFS on the store front of the New Golf Galaxy in Fairview Heights.


Edwardsville, IL – EXO Lounge

September 17th, 2024

From shinny new studs to intricate EIFS work on this new EXO Lounge in Edwardsville. We were a part of framing the exterior and interior walls, installing drywall and acoustical ceilings, taping and applying the Stunning EIFS finish.


Belleville, IL – Althoff Catholic High School EIFS Columns

August 26th, 2024

Our carpenters and plasterers dressed up the front columns at the entrance of Althoff Catholic High School. Our plastering crew applied the EIFS on the exterior columns.


Illinois – EIFS Starbucks

April 30th, 2024

Our plasterers recently completed the EIFS on 2 Starbucks. The one was located in Litchfield, IL and the other in Fairview Heights, IL.


Troy, MO – Troy South Elementary School

March 29th, 2024

Our plasterers recently completed the EIFS on the top two canopies as the new Troy South Elementary School.


EIFS

March 14th, 2024

Our plastering crew completed the EIFS on this beautiful new construction home.


St. Louis, MO – Normandy High School Addition

February 22nd, 2024

We recently finished this impressive addition at Normandy High School in St. Louis, MO. Our talented crews completed the exterior and interior framing, metal trusses, drywall, taping and EIFS work. The pictures speak volumes about our craftmanship and dedication.


St. Louis, MO – Marvin School EIFS

January 16th, 2024

We were selected as the EIFS contractor on Marvin School in St. Louis, MO. After old metal panels were removed, our talented plasterers completed an exterior insulation finishing system next to each window over CMU walls to give the school an updated look and provide energy efficiency. We worked closely with the General Contractor and […]


Bonne Terre, MO Residence

November 30th, 2023

Our talented plastering crew completed the EIFS (Exterior Insulation and Finishing Systems) to create this energy-efficient, fire-resistance, low-maintenance beautiful new construction Lake House. George Weis Company had previously finished the Boat House.